Skip to content

ISO 13485 contract manufacturer: what the standard means

For the purchasing and quality teams of medical device manufacturers who select or re-evaluate a contract manufacturer.

QualityBy FrégatePublished 7 min read

ISO 13485:2016 sets out the requirements of a quality management system for organisations that design, produce or supply medical devices. The manufacturer stays responsible for what it outsources: it selects the contract manufacturer, controls it and verifies what it delivers, with an effort proportionate to risk. An ISO 13485 certification is one selection criterion among others, and you read it together with its scope.

What does ISO 13485:2016 cover?

ISO 13485:2016 sets out the requirements of a quality management system specific to medical devices. ISO addresses it to organisations that design, produce or supply medical devices. It can also be used by their suppliers and other external parties that provide them with products or services.

The current edition is the 3rd, published in March 2016 by technical committee ISO/TC 210. When we checked on 23 November 2026, ISO had last reviewed and confirmed it in 2025, so it remains current. Compared with ISO 9001, which applies to every sector, it places more weight on regulatory requirements, risk management and process validation.

Its European version, EN ISO 13485:2016, with its 2018 corrigendum and its A11:2021 amendment, appears in the list of harmonised standards for Regulation (EU) 2017/745 on medical devices. That list is set by Implementing Decision (EU) 2021/1182, whose consolidated version dates from 17 June 2026.

For the manufacturer, the effect comes down to one rule. Unless there is duly substantiated evidence to the contrary, the notified body presumes that a quality management system that satisfies these standards complies with the requirements they cover (Annex IX, section 2.3).

Is ISO 13485 certification mandatory for a contract manufacturer?

No. Neither Regulation (EU) 2017/745 nor the GHTF guidance adopted by Health Canada makes certification of the contract manufacturer a condition. The manufacturer selects and controls its contract manufacturers within its own quality system. Certification is only one criterion among others. A manufacturer may still require it in its specification or quality agreement: that is then a purchasing choice, which the Regulation does not impose.

Article 10(9) of the Regulation lists “selection and control of suppliers and subcontractors” among the aspects the manufacturer’s quality management system must cover. The GHTF guidance on controlling products and services obtained from suppliers, adopted by Health Canada in 2010, names ISO 13485 or ISO 9001 certification among the evaluation factors. Other factors include the technology used, the supplier’s history and whether the product is standard or made to your specifications. The text adds that the manufacturer should not rely on that criterion alone.

A certificate therefore tells you one precise thing. A third-party body has audited the contract manufacturer’s quality system, within a given scope. It does not relieve you of evaluating that contract manufacturer or of checking what it delivers.

The manufacturer stays responsible for what it outsources

Outsourcing an operation does not transfer responsibility for the device. The GHTF guidance puts it in one sentence: the manufacturer cannot delegate any of its medical device responsibilities to the supplier.

It breaks supplier control into 6 phases:

  1. planning
  2. selection of potential suppliers
  3. supplier evaluation and acceptance
  4. finalisation of controls
  5. delivery, measurement and monitoring
  6. feedback and communication, including corrective and preventive action

The control effort follows the risk the product or service poses to the quality of the device.

The written agreement sets out each party’s share

Its name does not matter (contract, purchase order, bilateral arrangement): its content does. The guidance lists the points to cover, including:

  • acceptance and verification activities
  • handling of nonconformities, with corrective and preventive actions
  • change control, including when a validated process must be revalidated
  • labelling and traceability requirements
  • supplier audits
  • product recall
  • periodic re-evaluation of the supplier

The guidance also raises 2 points that go beyond the contract manufacturer alone. The first concerns its own suppliers: where risk requires it, your controls may have to extend to your supplier’s supplier, for example a sterilisation facility it uses. The second concerns process validation. Whichever entity carries it out, it is up to you to make sure it is done properly.

The Regulation adds a documentation requirement. Your technical documentation identifies all sites where design and manufacturing take place, including those of suppliers and subcontractors (Annex II, section 3).

Can your notified body audit your contract manufacturer?

Yes. Regulation (EU) 2017/745 provides that notified body audits take place, where appropriate, at the manufacturer’s subcontractors. Some of these audits are unannounced.

Annex IX provides for 2 types of audit for a manufacturer whose quality management system is assessed by a notified body:

  • surveillance audits and assessments at least every 12 months, which include, where appropriate, audits at the premises of the manufacturer’s suppliers or subcontractors (section 3.3)
  • unannounced on-site audits at least once every 5 years, at the manufacturer and, where appropriate, at its suppliers or subcontractors. The notified body draws up the plan without communicating it to the manufacturer (section 3.4)

Before the audit, the notified body identifies the suppliers and subcontractors concerned and considers whether to audit one in particular (Annex VII, section 4.5.2). A contract manufacturer that carries out an important step of your manufacturing must therefore be able to receive such an audit. Write this into the agreement, together with access to the records that will be requested.

Reading an ISO 13485 certification: scope first

The ISO 13485 logo on a brochure does not say what is certified. The certificate does.

Read it by comparing it with the operation you want to outsource. In particular, check:

  • the certified entity and the site or sites covered
  • the body that issued the certificate
  • the standard and its edition, ISO 13485:2016 at present
  • the scope: the activities (manufacture, control, storage, sale, for example) and the device families
  • the expiry date

A gap between that scope and your need does not rule out working together. It changes the nature of your controls. For an activity outside the scope, your evaluation relies more on your own means: a supplier audit, or the examination of a first article, a first batch or prototypes, which the GHTF guidance cites among the ways to evaluate a supplier.

A notified body certificate concerns the manufacturer

Do not confuse this certificate with those issued by a notified body under Regulation (EU) 2017/745. The latter concern the manufacturer and its devices. Their minimum content is set by Annex XII and they are valid for 5 years at most, renewable after a new assessment (Article 56).

CriterionISO 13485 certificateNotified body certificate
Issued bya third-party certification bodya notified body, under Regulation (EU) 2017/745
Coversa company’s quality system, within a given scopethe manufacturer and its devices
Contentthe scope: activities, device families, sites coveredthe minimum content set by Annex XII
Validityuntil the expiry date shown on the certificate5 years at most, renewable after a new assessment

Our ISO 13485:2016 certificate from DQS is for non-sterile dental medical devices

Our quality management system is certified to ISO 13485:2016 by DQS for the manufacture, quality control, storage and sale of non-sterile dental medical devices.

We state this because a certificate is read with its scope. On a dental project, we check with you at the project review that the activity you outsource falls within that scope. We also study manufacturing and packaging projects for other medical devices. On those projects, your evaluation will rest on our practices, which our customers already audit:

  • a batch record from raw material to shipment
  • checks at receipt, during production and before release
  • a certificate of conformity supplied with every delivery
  • measuring equipment calibrated by an external laboratory
  • regular microbiological checks entrusted to an external laboratory
  • internal audits, certification audits and customer audits

The detail of these checks is on our page on quality and batch traceability.

8 questions to ask before choosing a contract manufacturer

These questions take up the points above. Put them in writing and keep the answers in your evaluation file: the GHTF guidance asks you to keep the results of evaluations.

  1. What exactly does your certificate cover? Does the operation I am outsourcing fall within that scope?
  2. Which body issued it, and until what date is it valid?
  3. How is a batch traced, from raw material to shipment?
  4. What checks do you carry out at receipt, during production and before release? What does the document supplied with the delivery contain?
  5. Who calibrates your measuring equipment?
  6. How will I be told of a change of material, process or supplier?
  7. Who validates the processes whose result cannot be verified on the finished part? With what records?
  8. Will you accept my audits and those of my notified body, including unannounced ones?

For medical device contract manufacturing with Frégate, our answers follow our 4-step method: needs analysis, trials and validation, production and control, shipment. Tell us about your project as soon as your need is defined.

Sources for this guide

  1. ISO 13485:2016, Medical devices, Quality management systems, Requirements for regulatory purposes (overview page). International Organization for Standardization (ISO), accessed .
  2. Regulation (EU) 2017/745 of the European Parliament and of the Council of 5 April 2017 on medical devices, amending Directive 2001/83/EC, Regulation (EC) No 178/2002 and Regulation (EC) No 1223/2009 and repealing Council Directives 90/385/EEC and 93/42/EEC (Article 10, Article 56, Annexes II, VII and IX). Publications Office of the European Union (EUR-Lex), accessed .
  3. Commission Implementing Decision (EU) 2021/1182 of 16 July 2021 on the harmonised standards for medical devices drawn up in support of Regulation (EU) 2017/745 of the European Parliament and of the Council (consolidated version of 17 June 2026). Publications Office of the European Union (EUR-Lex), accessed .
  4. Guidance Document: Quality Management System, Medical Devices, Guidance on the Control of Products and Services Obtained from Suppliers (adoption of the GHTF guidance). Health Canada, accessed .

This article does not replace advice from a medical device regulatory professional.

A single point of contact, from needs analysis to shipment

Describe the operation you want to outsource: we start with an analysis of your needs.

Request a project review+216 70 038 461