Skip to content

From project review to series production in 4 steps

We support the development of your product: advice on material choice, prototypes, tooling development, then series production.

Green injection moulding machine, a technician in a lab coat adjusting it at the control panel.

The project review starts from your drawings, materials and protocols

The first step is the needs analysis. You send us what describes your product:

  • the drawings of the part or device
  • the planned materials, or the open question of which to choose
  • your cleaning, disinfection or sterilisation protocols
  • the packaging required: primary or secondary, labelling, instructions for use

We will review your technical requirements from these documents. The earlier they arrive, the more the tooling and the trials take them into account. We advise on the choice of materials, engineering plastics included: PEEK, for example, for the injection moulding of small precision parts.

If your project involves disinfection or sterilisation, we will work following your protocols, received at this stage. For parts you already manufacture, the review covers their inspection, sterilisation and packaging, in line with your requirements.

The review of a medical powder project covers weighing, dosing, blending and the final format, in dose packs or sachets. If your device needs technical packaging (a tube, case or box), we review it together with the part: we make and mark it too.

Prototypes, tooling and trials validated with you before series production

Step 2 is trials and validation. We make the prototypes and develop the tooling. The trials follow. We then validate the first parts with you, before production starts.

Every order produced with its checks and its batch record

Step 3 is production. Each batch has its record, opened at raw material stage. Its checks are defined: on receipt, during production and before release.

Depending on the part, production also includes trimming, finishing and pad printing. Each workstation processes one batch at a time, to prevent mix-ups. Our ISO 8 (Grade D) cleanroom is dedicated to packaging, with a separate area for secondary packaging. The checks and the batch record are described in detail on the quality and traceability page.

Your batches are identified, documented and tracked throughout manufacture. If a question arises later about a delivery, its history can be retrieved.

Shipment to Europe, certificate of conformity enclosed

We arrange shipments to Europe: that is step 4. Every delivery leaves with its certificate of conformity, which your quality department finds on each receipt.

The batch record covers the whole route, from raw material to shipment.

One contact for all 4 steps

Questions from your design office, purchasing or quality department reach the same person. This single point of contact at Frégate follows your project from the review of your specification to delivery. They know your drawings, your protocols and the results of the trials, so you do not have to explain them again with each order.

Are your drawings ready?

Describe your project, materials and protocols: we will analyse your needs and tell you how to send us your drawings.

Request a project review+216 70 038 461