Quality and traceability from raw material to shipment
We follow each batch in a record, check it at 3 points and deliver it with its certificate of conformity.

Quality system certified by DQS: non-sterile dental medical devices
Our quality management system is certified to ISO 13485:2016 by DQS for the manufacture, quality control, storage and sale of non-sterile dental medical devices.
This scope matches the trade we started in, dental. Our history is on the company page. We also study manufacturing and packaging projects for other medical devices. Whatever the device, every batch has its record and its checks.
What the standard expects of a contract manufacturer is summarised in our guide to ISO 13485 and contract manufacturing.
A batch record opened at raw material stage
Each batch has its own record and defined checks. Your batches are therefore identified and tracked from raw material to shipment. Depending on the operations you entrust to us, the record covers moulding, trimming, cleaning, disinfection or sterilisation following your protocols, primary and secondary packaging, labelling and instructions for use. For medical-use powders, it covers weighing, dosing, controlled blending and packaging in dose packs or sachets.
Two organisational rules apply as well. Each workstation processes one batch at a time, to prevent mix-ups. Work in progress and finished products are stored separately.
Checks at 3 points, from receipt to release
Checks begin on receipt, on the materials and on the parts you entrust to us. During production we apply those defined for your order.
The batch goes through a last check before release, then leaves with its certificate of conformity.
Your quality department has this certificate in hand when each delivery arrives. The batch record keeps the full trace of manufacture.
Labelling and instructions for use sit in the same batch record
We handle labelling and the creation and insertion of instructions for use, along with primary and secondary packaging. These operations are documented in the batch record, like moulding or sterilisation.
First parts validated with you, protocols applied as you send them
We carry out the trials and validate the first parts with you before any series. This is the second of the 4 steps of our method, from needs analysis to shipment.
Cleaning follows your protocols. We carry out disinfection and sterilisation in line with your requirements, from receipt of your parts to their final packaging. Your documents remain the reference for these operations.
Our customers audit us, as DQS does
Our system undergoes 3 types of audit: internal audits, certification audits and audits carried out by our customers.
If your supplier assessment procedure includes an on-site audit, the process is familiar to us.
Measurement and microbiology checked outside our walls
Our measuring equipment is calibrated by an external laboratory. Regular microbiological testing is also carried out by an external laboratory.
From the manufacturing area to the ISO 8 (Grade D) cleanroom
Manufacturing takes place in an area with controlled temperature and humidity. Another area is dedicated to preparation operations: your devices are prepared there following your protocols.
Our ISO 8 (Grade D) cleanroom is dedicated to packaging. Our guide to the ISO 8 cleanroom explains what this class covers. A separate area is dedicated to secondary packaging.

Your quality requirements are part of the review
Describe them with your project: we will review them from the needs analysis.
