Skip to content

Cleanroom packaging of medical devices in an ISO 8 room

We carry out the primary and secondary packaging of your devices, their labelling, and the creation and insertion of their instructions for use (IFU). Our ISO 8 (Grade D) cleanroom is dedicated to packaging, with one batch per workstation.

Cleanroom: an operator in protective clothing works at a stainless steel bench, blue door and pass box behind.

Primary packaging touches the device, secondary packaging protects it

Packaging takes place at 2 levels, each with its own role.

Primary packaging is the pack in direct contact with the device: pouch, blister, tube, sachet. It protects the device. For a sterile device it also maintains sterility until use: ISO 11607-1 calls this a “sterile barrier system” and sets its requirements. The choice of this system is set out in your file. We package with the components you specify, following your protocols.

Secondary packaging groups one or more primary packs in a carton or box. It protects them in transport and storage. It is often the secondary pack that carries the main label and the instructions for use. A dedicated area handles this secondary packaging.

An ISO 8 (Grade D) cleanroom, one batch per workstation

“ISO 8” refers to the air cleanliness classification of ISO 14644-1. In ISO class 8, the air holds at most 3,520,000 particles of 0.5 µm and larger per cubic metre. Grade D comes from European good manufacturing practice, which sets the same limit for that grade at rest. Our guide to the ISO 8 (Grade D) cleanroom explains these reference points and how they are monitored.

Only one batch is handled at each workstation, to prevent mix-ups. A label or a set of instructions for use can end up on the wrong product as soon as 2 batches share a work surface.

An external laboratory carries out regular microbiological checks.

Work in progress and finished products are stored separately.

Your instructions for use inserted at packaging, in your languages

We label your devices and create and insert their instructions for use. The content comes from your technical file: the manufacturer sets the information to be supplied and its wording. Our supplier lays out and prints the instructions for use from that content and your templates. We then insert them at the packaging stage.

The symbols on a medical device label generally follow ISO 15223-1: batch code, use-by date, manufacturer, sterile marking. Variable data, such as the batch or the date, are set for each production run.

Technical packaging is made and marked before your devices are packaged

We make and mark tubes, cases and boxes. This technical packaging then joins your devices at the packaging stage.

If your parts need cleaning and disinfection before packaging, we carry out these operations following your protocols. Medical-use powders are weighed, blended, then packaged in dose packs or sachets: the page on powder blending and packaging details these operations. A single point of contact follows the whole job.

Every delivery ships with its certificate of conformity

Every batch is documented from raw material to shipment. Checks take place on receipt, during production and before release.

The batch record lets you trace the components, operations and checks of a given batch. The detail of our checks and traceability is on the quality page.

Your packaging specification in 8 points

To prepare the project review we need:

  • the device and its condition on arrival (cleaned or not, sterile or not)
  • the primary pack: material, format, supplier, closure method
  • the secondary pack and the number of units per box
  • the label templates, with their variable data
  • the content of the instructions for use, its version index and the languages
  • the environmental requirements and the checks expected
  • the documents to include with each delivery
  • your volumes and batch sizes

Questions about packaging medical devices

Does an ISO 8 room make a device sterile?

No. It limits airborne particles during packaging. Sterility depends on a sterilisation process and on packaging that maintains it. We carry out disinfection and sterilisation in line with your requirements.

Do you supply the packaging components?

We make and mark tubes, cases and boxes. The other components (pouches, cartons, outer boxes) are agreed during the project review: who supplies them, to what specification, with what check on receipt.

Can you insert instructions for use in several languages?

Yes. Tell us the destination countries and the languages required: our supplier prints the instructions for use in those languages, then we insert them at the packaging stage.

Can your packaging cleanroom be audited?

Yes. We host customer audits, in addition to our internal and certification audits. The scope and date are agreed with your contact.

Packaging is prepared from your specification

Describe your packs, labels and instructions for use: we will review the organisation of the workstations with you.

Request a project review+216 70 038 461